After we removed the walkway
The customer wanted old decks with stairs removed. Did not want the walkway from the lower level to their master bedroom any longer. We removed all the old decking, built 2 new decks with treated lumber and round black metal spindles. Covered the old deck band with custom folded aluminum trim.
After we removed the walkway
The customer wanted old decks with stairs removed. Did not want the walkway from the lower level to their master bedroom any longer. We removed all the old decking, built 2 new decks with treated lumber and round black metal spindles. Covered the old deck band with custom folded aluminum trim.